1. Garufela Irrigation Project(Medium)
2. Burusuti Irrigation Project
3. Krisnai Irrigation scheme
4. Simen Irrigation Project(Medium)
5. Puthimari Major Irrigation Project.
6. Pollah Medium Irrigation Scheme
7. Jiri Medium Irrigation Scheme(Inter State Project)
| SALIENT FEATURES OF THE GARUFELA MEDIUM PROJECT |
| A. |
LOCATION |
|
| 1. |
State |
Assam |
| 2. |
District |
Kokrajhar |
| 3. |
Basin |
Garufela River |
| 4. |
Headworks Site |
3.5 km from PWD road crossing |
| B. |
HYDROLOGY |
|
| 1. |
Average Annual Rainfall(in mm) |
3714.00 |
| 2. |
Maximum discharge observed at Head works site(in cusec) |
845.70 |
| 3. |
Minimum discharge observed at headworks site(in cusec) |
67.20 |
| 4. |
Design discharge(in cumec) |
1800 |
| C. |
MAJOR STRUCTURES |
|
| 1. |
Length of headworks(in metres) |
148.00 |
| 2. |
Canal length(in Km) |
118.31 |
| 3. |
Canal discharge |
Qr=11.00 m3/s
Ql=05.39 m3/s |
| D. |
IRRIGATION STATISTICS |
|
| (a) |
Gross Command area (GCA)(in ha) |
11750 |
| (b) |
Culturable Command Area (CCA)(in ha) |
9820 |
| (c) |
Net Irrigable Area (NIA)(in ha) |
5200 |
| (d) |
Annual Irrigated area (AIA)(in ha) |
16560 |
| (e) |
Cropping Pattern and intensity before irrigation |
85.4% |
| (f) |
Cropping Pattern and intensity after irrigation |
180% |
| E. |
COST OF PROJECT(in lakh rupees) |
9796.00 |
| F. |
COST BENEFIT RATIO |
| 5% INTEREST |
10% INTEREST |
| |
2.46% |
1.4% |
| SALIENT FEATURES OF THE BURUSUTI MEDIUM PROJECT |
| A. |
LOCATION |
|
| 1. |
State |
Assam |
| 2. |
District |
Bongaigaon |
| 3. |
Basin |
Burusuti River |
| 4. |
Headworks Site |
Panbari village(Bijni circle) |
| B. |
HYDROLOGY |
|
| 1. |
Average Annual Rainfall(in mm) |
2614.65 |
| 2. |
Maximum discharge observed at Head works site(in cusec) |
294.29 |
| 3. |
Minimum discharge observed at headworks site(in cusec) |
34.18 |
| 4. |
Design discharge(in cumec) |
1500 |
| C. |
MAJOR STRUCTURES |
|
| 1. |
Length of headworks(in metres) |
109.00 |
| 2. |
Canal length(in Km) |
85.00 |
| 3. |
Capacity of Canal |
Qr=3.37cumec
Ql= 7.9cumec |
| D. |
IRRIGATION STATISTICS |
|
| (a) |
Gross Command area (GCA)(in ha) |
11500 |
| (b) |
Culturable Command Area (CCA)(in ha) |
7060 |
| (c) |
Net Irrigable Area (NIA)(in ha) |
6390 |
| (d) |
Annual Irrigated area (AIA)(in ha) |
11500 |
| (e) |
Cropping Pattern and intensity before irrigation |
85.00% |
| (f) |
Cropping Pattern and intensity after irrigation |
162.90% |
| E. |
COST OF PROJECT(in lakh rupees) |
6604.00 |
| F. |
COST BENEFIT RATIO |
| 5% INTEREST |
10% INTEREST |
| |
3.93% |
2.37% |
| SALIENT FEATURES OF THE KRISHNAI MEDIUM PROJECT |
| A. |
LOCATION |
|
| 1. |
State |
Assam |
| 2. |
District |
Goalpara |
| 3. |
Basin |
Krishnai River |
| 4. |
Headworks Site |
Matia development block |
| B. |
HYDROLOGY |
|
| 1. |
Average Annual Rainfall(in mm) |
3745.65 |
| 2. |
Maximum discharge observed at Head works site(in cusec) |
833.99 |
| 3. |
Minimum discharge observed at headworks site(in cusec) |
2.558 |
| 4. |
Design discharge(in cumec) |
3160 |
| C. |
MAJOR STRUCTURES |
|
| 1. |
Length of headworks(in metres) |
|
| 2. |
Canal length(in Km) |
41.65m |
| 3. |
Capacity of Canal |
Qr=2.83 m3/s
Ql= 3.3 m3/s |
| D. |
IRRIGATION STATISTICS |
|
| (a) |
Gross Command area (GCA)(in ha) |
5000 |
| (b) |
Culturable Command Area (CCA)(in ha) |
4200 |
| (c) |
Net Irrigable Area (NIA)(in ha) |
3500 |
| (d) |
Annual Irrigated area (AIA)(in ha) |
6300 |
| (e) |
Cropping Pattern and intensity before irrigation |
66.00% |
| (f) |
Cropping Pattern and intensity after irrigation |
199.00% |
| E. |
COST OF PROJECT(in lakh rupees) |
3500.00 |
| F. |
COST BENEFIT RATIO |
| 5% INTEREST |
10% INTEREST |
| |
2.54% |
1.5% |
| SALIENT FEATURES OF THE SIMEN MEDIUM PROJECT |
| A. |
LOCATION |
|
| 1. |
State |
Assam |
| 2. |
District |
Dhemaji |
| 3. |
Basin |
Simen River |
| 4. |
Headworks Site |
Long 94 Degree E & Lat 28 Degree N |
| B. |
HYDROLOGY |
|
| 1. |
Average Annual Rainfall(in mm) |
4729.14 |
| 2. |
Maximum discharge observed at Head works site(in cusec) |
3700.00 |
| 3. |
Minimum discharge observed at headworks site(in cusec) |
8.06 |
| 4. |
Design discharge(in cumec) |
4690 |
| C. |
MAJOR STRUCTURES |
|
| 1. |
Length of headworks(in metres) |
364.00 |
| 2. |
Canal length(in Km) |
180.00 |
| 3. |
Capacity of Canal |
Qr=3.5 m3/s
Ql=7.5 m3/s |
| D. |
IRRIGATION STATISTICS |
|
| (a) |
Gross Command area (GCA)(in ha) |
10000 |
| (b) |
Culturable Command Area (CCA)(in ha) |
7500 |
| (c) |
Net Irrigable Area (NIA)(in ha) |
6830 |
| (d) |
Annual Irrigated area (AIA)(in ha) |
13,192 |
| E. |
COST OF PROJECT(in lakh rupees) |
5104.00 |
| F. |
COST BENEFIT RATIO |
| 5% INTEREST |
10% INTEREST |
| |
5.55% |
3.29% |
| SALIENT FEATURES OF THE PUTHIMARI MEDIUM PROJECT |
| A. |
LOCATION |
|
| 1. |
State |
Assam |
| 2. |
District |
Nalbari and Kamrup |
| 3. |
Basin |
Puthimari river tributary of river Brahmaputra |
| 4. |
Headworks Site |
Okaldonga in Nalbari District near International border |
| B. |
HYDROLOGY |
|
| 1. |
Average Annual Rainfall(in mm) |
2595.00 |
| 2. |
Maximum discharge observed at Head works site(in cusec) |
2882 |
| 3. |
Minimum discharge observed at headworks site(in cusec) |
3.00 |
| 4. |
Maximum Design Flood discharge(in cumec) |
4094 |
| C. |
MAJOR STRUCTURES |
|
| 1. |
Length of headworks(in metres) |
190.00 |
| 2. |
Canal length(in Km) |
197 |
| 3. |
Canal Discharge(in cumec) |
| Right Canal |
Left Canal |
| |
2.50 |
15 |
| D. |
IRRIGATION STATISTICS |
|
| (a) |
Gross Command area (GCA)(in ha) |
20395 |
| (b) |
Culturable Command Area (CCA)(in ha) |
14800 |
| (c) |
Net Irrigable Area (NIA)(in ha) |
13105 |
| (d) |
Annual Irrigated area (AIA)(in ha) |
22000 |
| (e) |
Cropping intensity before irrigation |
110.88% |
| E. |
COST OF PROJECT(in crores rupees) |
100 |
| F. |
COST BENEFIT RATIO |
| 5% INTEREST |
10% INTEREST |
| |
2.65% |
1.65% |
Present Status: The detailed estimate and design of the project works (civil Works) have been updated. The design and estimate of gates and mechanical portion are in progress. The report on international aspect has already been sent to Central Water Power Commission, New Delhi. The proposal of environment clearance of the project needs to resubmit.
| SALIENT FEATURES OF THE POLLAH MEDIUM PROJECT |
| A. |
LOCATION |
|
| 1. |
State |
Assam |
| 2. |
District |
Barpeta |
| 3. |
Basin |
Pollah river sub-tributary of river Brahmaputra |
| 4. |
Headworks Site |
Patamajgoan in Barpeta District |
| B. |
HYDROLOGY |
|
| 1. |
Average Annual Rainfall(in mm) |
2596.00 |
| 2. |
Maximum discharge observed at Head works site(in cusec) |
|
| 3. |
Minimum discharge observed at headworks site(in cusec) |
|
| C. |
MAJOR STRUCTURES |
|
| 1. |
Length of headworks |
Yet to be designed |
| 2. |
Canal length |
Yet to be designed |
| 3. |
Canal Discharge |
Yet to be designed |
| D. |
IRRIGATION STATISTICS |
|
| (a) |
Gross Command area (GCA)(in ha) |
10537 |
| (b) |
Culturable Command Area (CCA)(in ha) |
8180 |
| (c) |
Net Irrigable Area (NIA)(in ha) |
7000 |
| (d) |
Cropping intensity before irrigation |
98% |
| (e) |
Cropping intensity after irrigation |
172% |
| E. |
COST OF PROJECT(in crores rupees) |
61.35(Rs.75000/ha) |
| F. |
COST BENEFIT RATIO |
| 5% INTEREST |
10% INTEREST |
| |
2.98% |
1.71% |
Present Status: The proposal is yet to be submitted to CWPC
| SALIENT FEATURES OF THE REGIONAL JIRI MEDIUM IRRIGATION SCHEME(NEC PROJECT) |
| A. |
LOCATION |
|
| 1. |
State |
Assam & Manipur |
| 2. |
District |
Cachar and Imphal East |
| 3. |
Basin |
Jiri/Barak River |
| 4. |
Headworks Site |
Laingangpokpi village,Jiribam in Manipur |
| 5. |
Latitude |
24o-10’-59”(E) |
| 4. |
Longitude |
93o-10’-16”(N) |
| B. |
HYDROLOGY |
|
| 1. |
Catchment Area |
755 |
| 2. |
Design Flood(in cumec) |
2580 |
| C. |
MAJOR STRUCTURES |
|
| 1. |
Length of Barrage(in metres) |
67.00(5 bays @ 12m) |
| 2. |
Canal length(in Km) |
| (a) |
Manipur Portion |
22.70+5.30=28km |
| (b) |
Assam Portion |
19.68+7=26.68 km |
| 3. |
Maximum Discharge of Canal(in cumec) |
| (a) |
Manipur Portion |
2.10 |
| (b) |
Assam Portion |
3.86 |
| 4. |
Distributories |
| (a) |
Manipur Portion |
12 |
| (b) |
Assam Portion |
12 |
| D. |
IRRIGATION STATISTICS |
|
| (a) |
Gross Command area (GCA)(in ha) |
7570 |
| (b) |
Culturable Command Area (CCA)(in ha) |
5750 |
| (a) |
Assam Portion |
3740 |
| (b) |
Manipur Portion |
2010 |
| (d) |
Annual Irrigated area (AIA)(in ha) |
9775 |
| (e) |
Intensity of Irrigation |
170% |
| E. |
COST OF PROJECT(in lakh rupees) |
| (1) |
Barrage and canal Manipur portion |
4846.55 |
| (2) |
Canal construction in Assam |
1843.50 |
| (3) |
Benefit Cost Ratio |
1.53 |
|